According to the construction of the Earth-rock cofferdam in east bridge, Yuxi Road, Chaohu City, the which uses the deep mixing pile diaphragm wall to reinforce the slope of the cofferdam, combining with the practical construction, introduces this construction method.%根据巢湖市裕溪路东桥土石围堰施工中,采用水泥搅拌桩连续墙加固围堰坡脚,结合实际施工,介绍这一施工方法.
展开▼