节点为框架结构的关键部位,对结构受力有重要的影响.采用有限元软件ABAQUS,在已有型钢锚脚的梁柱节点试验结果的基础上,给出了节点的设计方法及构造措施.%Alar of Xinjiang is located in the northern edge of the Taklimakan Desert, it closes to the Tarim River, and its site takes silt, silt sand as main part. Foundation treatment way of engineering construction projects in the region in the past was based on the composite foundation, rarely used pile foundation, let alone used prefabricated reinforced concrete pile in the engineering construction. In recent years, more and more projects of large load and sensitivity to sedimentation have been implemented in the region, only using composite foundation can not fully meet the requirements of engineering construction, which should use pile foundation. According to the pile test data oi Alar steel project reinforced precast concrete piles, this paper introduces the application of prefabricated reinforced concrete square pile in steel project construction of Alar region.
展开▼