When the requirements of proposed garden project and work content of integrated unit price are not entirely consistent, they cannot be directly applied, but should be converted separately according to different circumstances. This article summarizes the conversion method of garden engineering integrated unit price.%当拟建园林工程项目要求与综合单价工作内容不完全相符时,不能直接套用,应根据不同情况分别加以换算,本文就园林工程综合单价的换算方法进行了总结阐述.
展开▼