In order to get reasonable technical parameters before mixing pile construction, pile testing should be done first. Here below is the mixing pile testing condition of the sluice of a project for references of the same industry.% 为在搅拌桩施工前取得合理的技术参数,需先进行试桩,现将某工程水闸的搅拌桩试桩情况介绍如下,以便和同行探讨。
展开▼