通过对山东省滕州市解放大桥钢管混凝土索塔施工用脚手架的设计方案研究,介绍了如何对施工用百米脚手架进行设计与验算,以及脚手架搭设施工过程中的关键控制环节,为今后此类索塔脚手架的搭设提供了经验。% The paper studies the design program of scaffolding for steel tube and concrete-filled tower of Tengzhou Jiefang Bridge in Shandong province, and introduces the design and checking computation of scaffold for construction and the key control points in construction process, providing reference for scaffolding of cable belt tower.
展开▼