首页> 中文期刊>价值工程 >GL-03垂直段水冷壁安装

GL-03垂直段水冷壁安装

     

摘要

基于陕西府谷清水川煤电一体化项目电厂二期(2×1000MW)工程总体建设要求,分析#4机组锅炉水冷壁设计垂直管屏与螺旋管圈联合布置情况,明确垂直段水冷壁施工方案,并重点分析安装过程中的改进措施和注意事项,以供同行参阅。%Based on the general construction requirements of the coal and electricity integration project phase 2 project of Qingshuichuan Power Plant of Fugu County Shaanxi Province, this paper analyzes the joint arrangement of the vertical tube panel and helical tube coil of the design of water wall in #4 unit, defines the construction scheme of vertical segment water wall and mainly analyzes the improvement measures and matters needing attention in the installation process to provide references for the colleagues.