增加昌邑站、寿光站输油设备及自动化改造,添加减阻剂和发清管球清管作业等几个方面,对东黄复线有针对性的提出改造方案,达到其增输目的,实际已经进行了更换过滤网、流程改造和添加减阻剂提压试验,增大了输量。%By increasing oil transportation equipment and automation transformation in Changyi station and Shouguang station and adding drag reducer and pigging operation, targeted modification plan for Dongying-Huangdao multiple track is put forward in order to increase the throughout. The filter net has been replaced, the process has been reformed and adding drag reducer pressure increasing test has been done. The throughput has been increased.
展开▼