To summarize the construction method for the general clay dam filling, make the maximum values of personnel and machinery as well as the maximum efficiency of construction progress, the ministry conducted a dam construction from March 20, 2011 to October 20, 2011 combined with the actual situation at the scene, firstly summarized construction method, and then put forward some precautions to ensure the construction quality.%为简述总结一般粘土坝体填筑施工方法,使人员和机械都价值最大化,且施工进度最大高效,我部结合现场的实际情况,于2011年3月20日至2011年10月20日进行了坝体施工,首先总结了一下施工方法,然后提出了一些可以保证施工质量的注意事项。