首页> 中文期刊> 《价值工程》 >综采工作面快速安装技术的研究与应用

综采工作面快速安装技术的研究与应用

         

摘要

随着经济的发展,我国对于煤矿等能源的需求越来越大,这就对煤矿的采掘技术提出了更高的要求。综采技术的提升促进了产量的提高,而产量的提高又反过来导致了综采工作面搬家的次数增加。由于综采工作面所安装的综采设备体积大、质量大,解体、运输、组装工程量大,因此探究综采工作面快速安装技术对于提高矿井的生产效率具有重要的意义。本文将简要探究综采工作面快速安装技术。%With the development of economy, there is an increasing demand for energy such as coal mine in China, which puts forward higher requirements on coal mining technology. The improvement of fully mechanized technology has promoted the increase of production, and the improvement of production, in return, led to the increase in moving of fully mechanized working face. The fully mechanized equipment installed in the fully mechanized coal face has big volume and mass, and the dissolution, transportation and assembly quantity is big, so to explore the fast installation technology of fully mechanized working face has important meaning for improving the production efficiency of the mine. This article will briefly explore fast installation technology of fully mechanized working face.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号