In combination with the actual situation of engineering geology, hydrology and underground continuous wall construction in the subway station, this paper deeply analyzes the reason of clumping mud in the joint of underground continuous wall in deep foundation pit, and discusses the effective processing scheme.%结合地铁车站工程地质、水文及地下连续墙施工的实际情况,深入分析深基坑地下连续墙发生接缝夹泥的原因,并探讨出有效的处理方案。
展开▼