为了在施工条件非常恶劣的海况下快速成桩,节约有效的施工时间,根据实际地质情况、设计图纸和海港规范以及打桩设备,计算出钢管桩的摩擦力和最终贯入度。在平潭海峡大桥独立平台钢管桩的打设过程中,圆满完成工作任务,计算公式运用得当。%In order to quickly complete the offshore piles setting under very bad construction conditions save the construction time, according to the actual geological conditions, design drawings, harbour specifications and piling equipment, this paper calculated friction and ultimate penetration of steel pipe piles. In the course of playing and setting independent platform steel pipe pile of Pingtan Strait Bridge, the task is successfully completed and the formula is used properly.