首页> 中文期刊>价值工程 >高速铁路长大隧道施工机械配套技术研究

高速铁路长大隧道施工机械配套技术研究

     

摘要

In this paper, taking double line and single tunnel project of Hanghuang high-speed railway as the research object, it analyzed and studied the supporting project for the fast construction machinery of long tunnels, explored and summarized the construction experiences, in order to obtain the breakthrough and innovation in the tunnel construction technology and localization of equipment configuration, to improve the construction machinery supporting technical and theoretical level of long tunnels, and to provide powerful equipment guarantee for accelerating the railway tunnel construction.%本文以杭黄高速铁路双线单洞隧道工程为研究对象,对长大隧道快速施工机械化配套项目进行研究和探讨,探索和总结长大铁路隧道快速施工机械化配套的经验,在隧道施工技术和设备配置国产化上有所突破和创新,提高长大铁路隧道施工机械配套的技术和理论水平,为加快长大铁路隧道施工提供有力的设备保障。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号