In this paper,combining with the construction of the cast-in-place beam of the XS-LQ2 section bridge of Xuzhou Sanhuan elevated expressway project,aiming at the problems of cast-in-place full framing scaffolding construction,including large quantities,tight schedule,demand for safe and fast full framing scaffolding erection,M60 slotted scaffolding is used,which improves the safety,reduces the erection time,and can provide reference for similar projects.%文章结合徐州三环西路高架快速路工程XS-LQ2标段桥梁现浇梁施工,针对现浇梁满堂支架施工工程量大,工期紧,要求满堂支架搭设安全、快速的问题,采用M60盘扣式脚手架,提高了满堂支架的安全性、并减少了支架搭设时间,可在类似工程中借鉴实施.
展开▼