针对沈阳地铁土压平衡盾构穿越公铁桥施工,分析盾构穿越建筑物后沉降的发生机理和特点,概括了沉降控制措施及方法.%Based on the construction of Shenyang Metro earth pressure balance shield crossing railway bridge, this paper analyzes the mechanism and characteristics of the settlement of the shield after crossing the building, and summarizes the settlement control measures and methods.
展开▼