Based on the actual water quality of import and export and the facility operation situation,and to follow the principles of fully using status to treat facilities and not stopping the construction,determine the process plan of the Benxi city sewage treatment plant reconstruction and expansion for higher standard.After the completion of the project,the total processing capacity reached 300 thousand tons / day,water quality overall has reached the level of A,meeting the growing demand for water quantity and water quality.%本文结合本溪市污水处理厂实际进出水水质及设施的运行情况,遵循充分利用现状处理设施,做到不停产建设的原则,确定本溪市污水处理厂提标改造扩建工程工艺方案.项目建设完成后,总处理规模达到30万吨/天,出水水质全面稳定达到一级A标准,满足日益增长的水量和水质需求.