首页> 中文期刊> 《价值工程》 >可调式预埋槽安装施工技术

可调式预埋槽安装施工技术

         

摘要

It is widely used in the construction process of the pre-buried groove installed in the underground integrated pipe gallery. Tongzhou Project Department of China Railway Beijing Engineering Group applied"adjustable pre-buried groove"installation technology in the Beijing Urban Sub-Center Administrative Office Zone Start-up Area integrated pipe gallery (3 tenders) and was well received by all the units. The adjustable pre-buried groove installation technology is simple, environmentally friendly, easy to install, safe and fireproof, and can greatly improve the construction efficiency. It is also a new type of technology which is feasible, economical, environmentally friendly and operable.%预埋槽道安装在地下综合管廊施工过程中,应用广泛.北京城市副中心行政办公区启动区地下综合管廊(三标段)中铁北京工程局通州管廊项目部应用该项"可调式预埋槽"安装技术,受到了各单位一致好评.此种可调式预埋槽安装工艺,原材生产简单、绿色环保、安装简单、安全防火,并能够大大提高施工效率,也是一种实现快速施工切实可行、经济合理、绿色环保、可操作的新型工艺做法.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号