首页> 中文期刊> 《价值工程》 >盲沟排水系统在降低坡地地下室抗浮水位的应用研究

盲沟排水系统在降低坡地地下室抗浮水位的应用研究

         

摘要

对于需要采取抗浮措施的地下室,抗浮水位的高低是技术难度、工期、成本等控制因素.本文以曲靖某坡地建设项目为例,探讨了采用盲沟排水系统降低坡地地下室抗浮设防水位的技术可行性.研究结果表明:采用盲沟排水措施后,坡地地下室施工工期缩短,建设成本降低,经济效益明显,值得推广应用.%For anti-floating basement, the level of anti-floating water level is the control factor of technical difficulty, construction period and cost. Taking Qujing slope construction project as an example, this paper discusses the technical feasibility of using blind ditch drainage system to reduce the anti-floating waterproofing position in the basement of slope. The results show that: With blind ditch drainage measures, the construction period of basement in sloping field is shortened, the construction cost is reduced, and the economic benefits are obvious, so it is worth popularizing and applying.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号