首页> 中文期刊>价值工程 >利用抗爆间室销毁废起爆弹的安全技术措施探讨

利用抗爆间室销毁废起爆弹的安全技术措施探讨

     

摘要

For the safe and efficient destruction of abandoned explosive bombs on a large scale and the least impact on the surrounding environment, it is destroyed by the burnt-out method on the antiknock room site of the original detonating cord production workshop. Before deciding the destruction scheme, the burning properties and the distance of detonation were first tested to ensure that there will be no combustion, detonation and detonation during the burning process. The risk factors that may occur in the process of destruction were analyzed and appropriate safety and technical measures were taken. The entire destruction process did not occur safety accidents, but also the occupational health of operators were ensured. The destruction of the task was successfully completed and the reference was provided for the same type of project.%为了安全高效大规模销毁废弃起爆弹,对周围环境影响最小,在原导爆索生产工房的抗爆间室场地上,采用烧毁法进行销毁.在确定销毁方案前,首先对废起爆弹的燃烧性质和殉爆距离进行了试验,确保在烧毁过程中不会出现燃烧转爆轰的现象.分析在销毁过程中可能出现的危险因素,采取相应的安全技术措施予以防范.整个销毁过程没有出现安全事故,也确保了操作人员的职业健康.顺利完成了销毁任务,为同类型的工程提供了借鉴.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号