This paper takes a case study of a factory in Tianjin plain area, introduces data preparation of three dimensional geologic modeling, flow processes and model analysis of SKUA modeling. The established geological model involves 28 faults, 6 sets of strata in the geological structural maps, 3 geological sections. As a result, the SKUA modeling is of efifcient and practical.%以天津平原地区某个工区为例,介绍了三维地质模型建模的数据准备,SKUA建模的流程以及模型分析,共使用28条断层,6个地层的地质构造图,3条地质剖面构建了地质结构模型,表明SKUA建模是高效的和实用的。
展开▼