包头市“正翔国际”二期商业IMAX影厅工程,采用了大跨度现浇预应力空心楼板,通过分析结构实际的受力状态,拟定了结构在设计时需要采取的技术措施、设计要求及施工工艺,并对结构计算与构造进行了介绍,对于大跨度预应力空心板设计中可能遇到的问题进行了有益的探索。%The "zhengxiang" international business IMAX screens projectphase iiBaotou used a large span pre-stressed hol ow slab cast.By analyzing the structure of the actual stress state, technical measures and design requirements and construction technology have be taken in the design of the structure. Calculation and construction of the structure are introduced and useful exploration has be conducted of long-span pre-stressed hol ow problems.
展开▼