首页> 中文期刊>隧道建设 >扩挖支护对软弱围岩公路隧道初期支护结构影响分析

扩挖支护对软弱围岩公路隧道初期支护结构影响分析

     

摘要

由于山子顶软弱围岩公路隧道施工现场所采用的环形开挖留核心土法并不能保证隧道施工的顺利进行,提出扩挖支护施工方案.首先论述扩挖支护施工工序,然后采用ANSYS有限元方法构建扩挖支护厚度为0、20、30、40、50、60cm 6种三维计算模型,系统分析扩挖支护与初期支护的力学行为.研究得出:扩挖支护是软弱围岩隧道一种相对优越的施工方案,且当扩挖支护厚度达到60cm时初期支护的主压应力为16.4MPa,主拉应力为0.48603MPa,满足其材料强度要求.%The annular excavation with core soil method used in Shanziding Highway Tunnel can not guarantee successful tunnel construction in weak surrounding rock, so the expanding lining method is put forward. First, construction sequences of expanding lining method are discussed;and then,ANSYS finite element method is adopted to establish 3D computational models for expanding lining with thicknesses of 0,20,30,40,50 cm and 60cm; finally, mechanical behaviors of expanding lining and primary support are analyzed. It is concluded that expanding lining is a relatively superior method for tunnel construction in weak surrounding rock; and when thickness of expanding lining reaches 60 cm, principal compressive stress and tensile stress of primary support are 16.4 MPa and 0.486 03 MPa respectively,which can meet the material request.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号