首页> 中文期刊> 《天津大学学报:英文版》 >Application of Risk Probability Evaluation Method to Offshore Platform Construction

Application of Risk Probability Evaluation Method to Offshore Platform Construction

         

摘要

Offshore project risk concerns many influence factors with complex relationship, and traditional methods cannot be used for the evaluation on risk probability. To deal with this problem, a new method was developed by the combination of improved technique for order preference by similarity ideal solution method, analytical hierarchy process method and the network response surface method. The risk probability was calculated by adopting network response surface analysis based on the state variable of a known event and its degree of membership.This quantification method was applied to an offshore platform project, Bonan oil and gas field project in Bohai Bay in June 2004.There were 7 sub-projects and each includes 4 risk factors.The values of 28 risk factors, ranging from 10^-6 to 10^-4, were achieved. This precision conforms to the international principle of as low as reasonably practically.The evaluation indicates that the values of comprehensive level of construction group and ability of technical personnel on the spot are relatively high among all risk factors, so these two factors should be paid more attention to in offshore platform construction.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号