首页> 中文期刊> 《系统工程与电子技术》 >复杂装备研制项目进度规划 GERT 网络“反问题”模型

复杂装备研制项目进度规划 GERT 网络“反问题”模型

         

摘要

In the complex equipment development project,it is very difficult to manage the project schedule planning since the complexities and uncertainty characteristics occur throughout the development process.The development process of complex equipment is viewed as a whole system consisting of a series of landmark events based on the idea of the system theory.Firstly,a graphic evaluation and review technique (GERT)network model is designed to describe the complex equipment development project,then the complex equipment develop-ment project completion time GERT network “inverse problem”solving algorithm is discussed.Finally,a model is used to solve the expected completion time based on a certain aircraft development project,the result of the ex-ample shows the validity of the model.%在复杂装备研制项目中,由于其研制过程中的多种复杂性和不确定性特征使得对项目的进度规划管理非常困难。文章基于系统论的思想,把复杂装备的研制过程看作是由一系列标志性事件组成的整体系统,定义了复杂装备研制项目的图示评审技术(graphic evaluation and review technique,GERT)网络模型,讨论了复杂装备研制项目完成时间的 GERT 网络“反问题”求解思路。以某飞机研制项目为例,对其期望完成时间进行了规划。

著录项

  • 来源
    《系统工程与电子技术》 |2015年第12期|2758-2763|共6页
  • 作者

    刘红旗; 方志耕; 陶良彦;

  • 作者单位

    南京航空航天大学经济与管理学院;

    江苏 南京 210016;

    南京航空航天大学科学发展研究中心;

    江苏 南京 210016;

    南京航空航天大学经济与管理学院;

    江苏 南京 210016;

    南京航空航天大学科学发展研究中心;

    江苏 南京 210016;

    南京航空航天大学经济与管理学院;

    江苏 南京 210016;

    南京航空航天大学科学发展研究中心;

    江苏 南京 210016;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 管理学;
  • 关键词

    复杂装备; 进度规划; 图示评审技术网络; 反问题;

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号