首页> 中文期刊>中国工程科学 >Study of the Pavement Settlement Standard Induced by Tunnel to Under-traverse Highway in Close Quarter

Study of the Pavement Settlement Standard Induced by Tunnel to Under-traverse Highway in Close Quarter

     

摘要

Now the surface settlement induced by shallow buried tunnel to under-traverse highway,mostly adopt the empirical value,3 cm,acquired from Beijing or Shenzhen metro,which is regarded as the controlling standard.But to more project,tunnel under-traverse highway,we must decide the controlling standard flexibly,which should base on the pavement service function and the pavement condition.The thesis,based on the pavement evenness and running comfort ability in the view of completing the pavement service function,supposes the longitudinal pavement settlement cross section as a quadratic parabola,and gets the maximal settlement value in the range of longitudinal pavement influence when the tunnel is under-traverse highway perpendicularly.Then the controlling standard is decided.As Wenxiang Tunnel under-traverse Lianhuo Freeway on Zhengzhou-Xi'an Passenger Dedicated Railway Line for an example,the settlement controlling standard is acquired,and we hope it has an direction and reference value to similar tunnel construction.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号