Based on DALIAN DEVELOPER drill ship, this paper introduces the design method of high pressure mud system of deep water drill ship and the special requirements during material chosen process. This research provides good experience for the high pressure mud system design of other offshore project.%以“大连开拓者”深水钻井船为例,介绍了深水钻井船高压泥浆系统的设计方法,总结了高压泥浆系统在材料选择时需注意的特殊要求,为其他类似海工产品高压泥浆钻井系统的设计提供了经验。
展开▼