In order to improve the dynamic positioning capability of HYSY-278, the DP-2 dynamic positioning system of the boat was upgraded to DP-3.The original arrangement of the propeller room was planned and adjusted to satisfy the requirement of DP-3 redundant design according to the requirement of CCS .The A60 fire-proof walls were arranged among the propeller rooms .%介绍“海洋石油278”船从DP-2动力定位系统升级至DP-3动力定位系统后,推进器舱室的布置方案设计。为满足DP-3动力定位系统对推进器舱的冗余设计要求,根据CCS规范要求,对该船推进器舱的布置方案重新进行规划和调整,在冗余的推进器舱室之间设置A60防火墙。
展开▼