The Haiyang-Shiyou 113 FPSO has no real-time power management system to control the unit output and platform load size, the original unloading system of the oilfield group cannot unload accurately and realize the real-time calculation of the standby load.In order to meet the requirements of permanent production for the FPSO, and improve the operation reliability of power system, the PMS control system is applied successfully in the permanent production recovery project.%针对海洋石油113 FPSO没有专门的电力监控系统,无法实时了解发电机组出力以及平台负荷大小分配情况,同时原有油田群的分级卸载无法进行精确卸载和电网热备量的实时计算等方面问题和缺陷,采用和引入电站能量管理系统对电网进行改造,实现了海洋石油113 FPSO永久复产后电站系统的运行稳定,提高了电站系统运行可靠性和安全性.