FPSO is the key unit of the offshore field.In order to maintian the production during the FPSO dry dock period, a temporary production recover solution is needed.A solution using DP FPSO is designed to recover the production without the o-riginal FPSO.The solution is proved to be feasible in technical consideration by comprehensive research in several importance factors.%为了保证FPSO坞修期间油田产量,需要考虑临时生产方案,对采用动力定位FPSO进行临时生产的技术方案进行多方面的对比,论证临时生产方案的技术可行性.
展开▼