Combining with the engineering cases,aiming at the problem of deformation of workshop wall-column,the paper adopts the design method by hanging wall-column upper end on crane beam and the connection between lower horizontal part and rigid terrace,and proves by the practice that the design method saves the foundation treatment cost with reasonable stress and simplified construction.%结合工程实例,针对工程中厂房墙皮柱的变形问题,采用了将墙皮柱上端悬挂于吊车梁上,下端水平连接于刚性地坪的设计方法,经实践表明采用该设计方法节约了地基处理费用,使得受力合理,同时简化了施工。