Based on the formation tester analysis processes put forward by the arm onto the testing process in the formation of security issues and propose solutions to the measures used in the design of multi--stage hydraulic accumulator effective solution of the compatibility and rellahility two main issues.%本文通过对地层测试仪作业流程进行分析提出了推靠臂在地层测试过程中的安全问题并提出解决措施,在设计中采用多级液压蓄能器有效的解决了兼容性和可靠性两大问题。
展开▼