This article is about common problems analysis of geological survey of Dongting Lake Area Dyke Reinforce -ment Project.All kinds of reasons and solutions of possible problems which may refer to other projects are disscussed . The survey and design can not be separated , the preliminary data collection and analysis should be all-round .%对洞庭湖区堤防加固工程中地质勘察常见问题进行分析及探讨, 剖析其存在的原因及处理方法,提出勘察与设计不能脱节, 前期资料收集整理和分析要全面等应对措施.
展开▼