首页> 中文期刊>资源环境与工程 >敦化抽水蓄能电站输水发电系统勘察重点探析

敦化抽水蓄能电站输水发电系统勘察重点探析

     

摘要

The investigation emphases on water conveyance and power generation system of Dunhua pumped storage pow -er station are analyzed through reviewing the preliminary engineering geological investigation ,which mainly including the selection of location and axis of the underground powerhouse , the stability analysis of surrounding rock of underground powerhouse cavern complex ,the evaluation of ground stress and rock burst ,the seepage characteristics for the surrounding rock of high pressure pipes and branch pipe sections ,and the selection of lining pattern of high pressure pipeline .%回顾敦化抽水蓄能电站前期工程地质勘察工作,梳理分析输水发电系统的勘察重点,主要包括:地下厂房位置及轴线的选择、地下厂房洞室群围岩稳定分析、地应力与岩爆评价、高压管道和岔管段围岩渗透特性研究、高压管道衬砌形式选择等。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号