随着盾构法隧道施工在城市交通工程中的日益发展,隧道修建时将不可避免地截除城市中一些重要建(构)筑物桩基,稍有不慎,后果不堪设想,因此采取有效的桩基托换,选择合理盾构施工参数,增加必要的技术措施成为盾构掘进直接截除桩基施工的关键。%With the fast development of shield tunnel construction in city traffic engineering, it is inevitable to cut off the piles of some important building in tunnel construction. A minor mistake may cause serious consequence. It is a decisive point to take effective pile foundation supporting, choose rational shield parameter and add some necessary technical measures.
展开▼