针对传统工程进度管理手段的不足,将数据库管理、桥梁三维参数化建模、形象进度表达、人机交互技术运用于高速铁路桥梁施工进度管理,研发高铁桥梁三维施工进度管理系统,形象、直观地展示桥梁施工进度,为管理者提供更好的决策支持.叙述了系统的设计思路与实现方案,并介绍了该系统应用于长昆线施工管理的工程实例.%According to the defect of the traditional way of construction scheduling management, database management, parametric 3D modeling for bridges, human-computer interaction techniques were applied into the domain of the construction scheduling management for bridges of high speed railway. The 3D-Construction Scheduling Management System was developed to display the procedure of construction for bridges visually and intuitionally. The design and functions of the System were explained in this paper. The System has been put into practice in the construction management of Changsha-Kunming Railway Project.