以巴基斯坦卡西姆港集装箱码头工程为例,介绍该项目从竞投标、准备到实施阶段的主要工作内容,重点分析“以设计为核心,兼顾施工条件和采购渠道”的EPC模式的优势,总结以设计为核心的EPC模式在该项目建设中取得的经验,为我国工程企业境外总承包工程提供参考.%Pakistan Qasim International Container Terminal Project is used as an example to introduce major work in three stages of tendering and bidding, project preparation and implementation; analyze the advantages of EPC mode in which design is the core, and attention is given to construction condition and procurement channel; summarize successful experience of EPC mode with the core of design in Qasim International Container Terminal Project, which will provide the reference for Chinese engineering enterprises contracting overseas EPC project.
展开▼