首页> 中文期刊> 《港工技术》 >码头输煤通道的桥隧方案比较研究

码头输煤通道的桥隧方案比较研究

         

摘要

The coal conveying channel of Nantong power plant terminal has to go across Tianshenggang waterway and Henggangsha shoal. In order to decrease the impact on the navigation of Tianshenggang waterway, monographic study is done respectively for the coal conveying channel passing Tianshenggang waterway by bridge or tunnel. The superiority of the bridge construction at the present stage is proved through the comparison and analysis of the above options for coal conveying channel.%南通电厂码头输煤通道需跨越天生港水道和横港沙,为减少输煤通道对天生港水道通航的影响,设计分别就输煤通道采用桥梁方案和隧道方案通过天生港水道进行了专题研究,通过对两种输煤通道方案的比较和分析,提出在现阶段实施桥梁方案的优越性。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号