Based on phase-1 project and breakwater phase-2 project of west habor at Yantai Port,relevant physical model test is adopted to analyze the above problem,and propose corresponding solution,which will provide references for similar port engineering.%基于烟台港西港区一期工程及防波堤二期工程,结合物理模型试验,对斜坡式与直立式防波堤结构的连接处理进行分析,提出相应的解决方法,供同类港口工程参考。
展开▼