本文通过分析苏州港太仓港区某码头工程的地质条件和荷载要求,综合考虑工程自然条件、使用要求、施工能力和工程造价等因素,并结合已有的施工资源情况、经验因素等,通过对码头桩基、上部结构等水工结构的设计优化,降低了施工难度,缩短了施工工期,节约了工程投资.%This paper analyases geological conditions, and load requirement of one wharf at Taicang port area of Suzhou port, conprehensively considers the natural conditions, operating requirements, construction capacity, construction cost and other factors, and combined with existing construction resources, experience, etc, through design optimization of pile foundation, superstructure and so on, reduce the difficulty of construction, shorten the construction period, save the project investment.
展开▼