取水工程为核电厂重要构筑物,按照较高的核电标准设计往往断面较大,在保证取水安全的前提下,分析不同工程的使用要求,有针对性的的进行优化设计,可降低工程造价.以田湾核电取水工程为例,分析优化设计过程,供类似工程参考.%As an important structure of nuclear power plant, the application of higher nuclear power standard resulted in larger section of water intake engineering. In order to guarantee the safety of water intake, the use requirements for different projects were analyzed, which led to the optimum design, for example, the reduction of construction cost. Tianwan nuclear power plant water intake project was taken as an example to analyze the process of optimum design, which would serve as a reference for similar projects.