结合澳门某填海工程地基处理的实测沉降数据,采用三点法、双曲线法和Asaoka法推算软基的固结度和最终沉降量,分析了各种计算方法的适用性和局限性,有效指导了工程施工,为今后类似填海工程的监测工作提供了有益的参考.%Based on real-measured settlement data about the foundation treatment of one sea reclamation project in Macau, three-point, hyperbolic and Asaoka methods are used to calculate the degree of consolidation and final settlement of soft base. Furthermore, the above methods are analyzed from the aspects of applicability and limitation. The research results are available for the construction, and serve as a reference for the monitoring of similar reclamation projects in future.
展开▼