随着抚顺东露天矿矿坑开采降深的发展,洗煤厂厂区清水源供水出现不足现象,同时工厂排放的煤泥水得不到充分沉降,含有可回收资源,大量流失会对周边的环境造成污染,给企业造成经济损失,针对循环水系统改造方法的生产工艺进行了详尽的介绍。%With the development of mining drawdown in Fushun East Open-pit Mine, the coal preparation plant appears insufficient phenomenon in a clean water supply. The slime water of factory emissions cannot get full sedimentation and contain the recycled resources. A large number of erosion can cause pollution to the surrounding environment, which causes economic losses to the enterprise. This article introduces the production process of circulating water system transformation method.
展开▼