靖远矿区通过土地整治、拦渣、植物防护、绿化和边坡防护等工程措施,对尾矿库进行了综合治理,减缓了水土流失,改变了矿区恶劣的生态环境,为矿区的持续稳定发展奠定了坚实的基础.%Through the land improvement,slag control,plant protection,greening and slope protection,the comprehensive treatment on the tailings reservoir in Jingyuan mining area is carried out.These measures decrease water and soil erosion and change the bad ecological environment,which provides a solid foundation for the continuous and steady development of mining area.
展开▼