根据多绳缠绕式提升机的模型,对多绳缠绕式提升机钢丝绳同步方案进行了探讨,并对钢丝绳发生错误缠绕后浮动天轮的工作状况进行了分析,指出了浮动天轮潜在的问题,为多绳缠绕式提升机钢丝绳同步方案的设计和应用提供了理论基础.%According to the model of multi-rope winding hoist,the synchronization scheme of wire ropes of the multi-rope winding hoist was discussed,and the working condition of the floating head sheave after miswinding was analyzed.The potential issues about the floating head sheave were pointed out,which offered theoretical basis for the design and application of the synchronization scheme of wire ropes of the multi-rope winding hoist.
展开▼