Based on the structure of the present wire-line coring tool and the measurement while drilling,a new set of electromagnetic measurement while drilling (EM-MWD) for wire-line coring was designed.In addition,ANSYS was applied to analyze the influence of the installation structure on signal transmission.The influence of the installation structure on signal transmission attenuation was less than 3%.Field test showed the installation structure had no influence on the current wire-line coring process and could be directly applied to the current wire-line coring.%基于现有绳索取芯钻具和随钻测量仪器结构,设计了一套应用于绳索取芯钻进的电磁波随钻测量仪器,并运用ANSYS仿真软件分析了仪器安装结构对信号传输的影响,该安装结构对信号传输衰减影响小于3%.现场试验表明,该安装结构不影响现有绳索取芯钻进工艺,可直接用于现有绳索取芯钻进中.