首页> 中文期刊> 《矿业工程》 >井下多层开采地压控制管理的分析与研究

井下多层开采地压控制管理的分析与研究

         

摘要

For block caving mining,the deepening of backstoping and wallrock fracture leads to ground pressure damaging the orebody,finally causing roadway deformation and backstoping impossible to go on.After making a analysis of this problem,a series of safety production measures are put forward,for example,digging and mining are carried out simultaneously;large quantity of ores are mined at a specific area and safety pillars are retained.Pressure-relief type backstoping are done for part of the orebody,which is of great significance to rational development and utilization of mine resources and the building of safe and economic large-scale mines.%无底柱崩落采矿法,随着回采深部的加大及围岩的破碎程度,致使地压对原体产生破坏,导致巷道变形而无法回采。通过对该问题进行分析,提出采矿边掘边采进行局部大量出矿及留有保安矿柱等一系列的安全生产措施,对现存局部矿体进行泄压式回采,对矿山资源的合理开发利用及创建安全节约型大型矿山具有重要的意义。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号