既有路基两侧帮宽施工因受到各种不确定因素的影响,常导致路基无法正常排水。根据实际施工经验,提出了对路基无法排水的处理方案。%Both sides of subgrade construction due to be affected by a wide variety of uncertain factors, often leads to the roadbed can’t drain properly. According to the actual construction experience, can’t be made on the roadbed drainage treatment program.
展开▼