Plateau 750 kV substation dc melt construction project evaluation index system is designed to measure project engineering level comprehensively, based on the project cost, technology, environmental protection, economy, and several aspects such as market demand established plateau 750 kV substation dc melt construction project evaluation index system, the market demand, the social economic benefits, natural environment, technology and engineering cost index are analyzed, for the plateau 750 kV substation dc construction project of construction and retrofit of melting ice, 750 kV substation dc propulsion plateau melt construction work laid the foundation of refinement and accuracy.%高原750 kV变电站直流融冰建设工程评价指标体系旨在全面衡量项目工程水平,基于工程造价、技术含量、环保性、经济性及市场需求等多个方面建立了高原750 kV变电站直流融冰建设工程评价指标系统,对市场需求、社会经济效益、自然环境、技术水平和工程造价指标进行了分析,为以后高原750 kV变电站直流融冰建设工程的建设和改造,推进高原750 kV变电站直流融冰建设工程工作的精细化和精准化奠定了基础。