首页> 中文期刊> 《海洋经济》 >天津北疆电厂海水资源开发利用及取水工程关键技术

天津北疆电厂海水资源开发利用及取水工程关键技术

         

摘要

Tianjin Beijiang Power Plant, on the level pilot project for sustainable economy. The northwest coast of Bohai Bay, is a nationalsite is a shallow muddy coast with mild slope and high sediment concentration, which is not conducive to seawater intake. By means of comparing tidal creek and settling ponds schemes, the two-step settling ponds scheme is finally selected. The constructed intake work with advantages of high guarantee rate of water supply, reliable quality and quantity, low investment, convenience of management, is a new way of seawater intake in muddy coasts. The plant has made full use of seawater and produced highquality desalinated water, which marks that the project objectives have been achieved.%天津北疆电厂是国家首批循环经济试点项目,其选址渤海湾西北湾顸,海岸坡缓水浅、含沙量大.不利于电厂取水。通过引潮沟方案和沉淀池方案的比选研究,最终采用两级沉淀调节池高潮进水方案,不仅具有取水保证率高、水质条件好,而且工程投资低、运行灵活、维护方便,是淤泥质浅滩上一种新型的取水方式。该电厂充分利用海水资源,并生产出高品质的淡化海水,标志着该项目的循环经济建设目标已经全部实现。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号