首页> 中文期刊> 《钢铁研究学报:英文版 》 >Steel-Making and Continuous/Ingot Casting Scheduling of Mixed Charging Plan Based on Batch Splitting Policy

Steel-Making and Continuous/Ingot Casting Scheduling of Mixed Charging Plan Based on Batch Splitting Policy

         

摘要

For steel-making and continuous/ingot casting are the key processes of modern iron and steel enterprises, this paper proposes a batch splitting schedule policy to solve continuous and ingot casting schedule of mixed whole/half charging plan for steel making. First establish the model of continuous and ingot casting schedule of mixed whole/half charging plan according to the complex constraints. Then solve this model by heuristic algorithm. Finally use actual data to prove the proposed algorithm′s validity and analyze the application result in steel plant.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号