本文对高炉余压发电顶压控制过程存在问题、影响因素进行了分析,针对存在问题提出了解决顶压偏差过大的两种方案,以及方案的具体实施过程,为过程控制优化提供了一种切实可行方案.%The analysis is about the problem course of cotrolling of the top pressure about the blast funace and infuence factor in the paper, and apply two planning about decreacing the top pressure deviation of blast furnace,and apply the detail execution course about the planning, apply a model about optimizing controlling.
展开▼